The Hub of Southwest Virginia

The Hub of Southwest Virginia

Facebook Image

County Taxes

Community Calendar

Last month November 2017 Next month
S M T W T F S
week 44 1 2 3 4
week 46 5 6 7 8 9 10 11
week 47 12 13 14 15 16 17 18
week 48 19 20 21 22 23 24 25
week 26 27 28 29 30

Upcoming Events

Tue Nov 21 @ 8:00AM -
Budget Committee
Tue Nov 21 @ 9:30AM -
Water Committee
Wed Nov 22 @12:00AM - 05:00PM
Offices Closed - Thanksgiving Holiday
Thu Nov 23
Offices Closed - Thanksgiving Holiday
Thu Nov 23 @ 9:00AM -
CPMT Meeting
Fri Nov 24
Offices Closed - Thanksgiving Holiday
Tue Nov 28 @ 9:00AM -
Board of Supervisors Meeting
Tue Nov 28 @ 7:00PM -
Public Hearing - Bond Issuance
Mon Dec 04 @ 7:00PM -
Planning Commission
Tue Dec 05 @ 8:00AM -
Building & Grounds Committee
Thu Dec 07 @ 8:00AM -
Economic Development Committee
Tue Dec 12 @ 7:00PM -
Board of Supervisors' Meeting
Home
Welcome to Wythe County Virginia
PUBLIC MEETING - Speedwell Phase III Waterline PDF Print E-mail

The Wythe County Board of Supervisors will hold a public meeting on Tuesday, April 11, 2017, at 6:00 p.m. at the Wythe County Board of Supervisors Board Room, 340 South 6th Street, Wytheville, Virginia, to provide information and to receive citizen’s comments regarding the project, alternatives considered, environmental impact, project costs, and associated user charge impacts for the Speedwell Phase III waterline. Project documentation, including project alignment plans, is on file for public view at the Wythe County Administrator’s Office, 340 South 6th Street, Wytheville, VA 24382-2513. 

Comments: written or verbal comments will be accepted at the meeting or read aloud if submitted in writing by 5 p.m. Monday, April 10, 2017 to William Vaughan, PE, at 340 South 6th Street, Wytheville, VA 24382-2513. 

Special Needs Notice: individuals requiring special assistance to participate in the meeting should contact William Vaughan, PE, County Engineer at (276) 223-4500.

 

 
Public Input Meeting On Lovers Lane Alternatives PDF Print E-mail


Progress Park Connector Road: Public Input Meeting On Lovers Lane Alternatives is scheduled for 6 pm, Thursday March 23, 2017 in the Board of Supervisors Meeting Room, 340 South Sixth Street, Wytheville, Virginia. 

Mr. Scott Bortz, PE, will be making a presentation of the options that have previously been presented to the Board.  Comment sheets will be provided for the citizens. 

The following web site (Wythe County cloud) has been established and contains the connector road alignment drawings from the July, 2016 brief and the Lovers Lane alternatives brief from February, 2017. 

https://cloud.wytheco.org/index.php/s/Ckmf6eloDYxhXPf 

Password: progress

 
Public Hearing Notice PDF Print E-mail

In compliance with Section 15.2-4311 of the Code of Virginia, the Wythe County Board of Supervisors will conduct a public hearing.  The purpose of the public hearing is to consider adopting Amendment No. 2 to Ordinance No. 99-3 entitled, “Crockett’s Cove and East Crockett’s Cove Agricultural and Forestal District Ordinance of Wythe County, Virginia”.  The proposed amendment will extend the districts for a period of ten years.

The public hearing will be held on Tuesday, May 9, 2017, at 7:05 p.m. in the Board Room of the Wythe County Administration Building, 340 South Sixth Street, Wytheville, Virginia.

The Board of Supervisors will hear comments from citizens concerning the adoption of such amendment.  A copy of the amendment, map and other related materials are available for review in the County Administrator’s Office. 

BY ORDER OF THE
WYTHE COUNTY BOARD OF SUPERVISORS
STEPHEN D. BEAR
COUNTY ADMINISTRATOR

 
Meeting Notification PDF Print E-mail

The Wythe County Board of Supervisors will meet for a budget work session on Monday, March 27, 2017, beginning at 8:15 a.m. in the Board Room of the County Administration Building, 340 South Sixth Street, Wytheville, Virginia.

 
RAPER RIDGE WATER TANK PDF Print E-mail

The Wythe County Board of Supervisors is seeking proposals for engineering services related to the construction of a 1.5 million gallon water storage tank in Wythe County, Virginia. The project will be sited at the existing Raper Ridge tank site and consists of the construction of a new 1.5 million gallon concrete storage tank (80-ft diameter with 40-ft side water depth), additional piping connections to an existing 20-in water main, tank overflow and drain lines (discharge to an on-site rip rap splash basin), associated control valves and telemetry, the extension of an existing gravel access road, grading and seeding, and erosion and sediment control measures. The engineering services required include: basic services, to include preliminary and final design documents, contract award documents, construction engineering oversight and coordination; and additional services such as easement assistance and permitting (state, federal, and other regulatory agencies). The successful offeror will work closely with the Wythe County Engineer and will be the Engineer-of-Record for the project. A preliminary engineering report has been developed and is available for review. Preliminary construction estimates are in the $1 million to $5 million range.

Interested offerors are requested to provide five copies of qualifications and references on Standard Form (SF) 330.

Proposals will be received at the office of Stephen D. Bear, Wythe County Administrator, 340 South Sixth Street, Wytheville, VA 24382 until 2:00 p.m. local prevailing time Friday, March 17th, 2017.

All elements of this project will comply with US Department of Agriculture Rural Development guidelines.

Wythe County encourages the participation of MBE/WBE type firms.

Please note that the County of Wythe reserves the right to award in part or in whole or to reject any or all proposals.

 
<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Page 6 of 10
 
Joomla 1.5 Templates by Joomlashack